With tight deadlines, we measured and made the tensioned roof and clear sides in under a week. We took final measurements while the engineers were still welding the frame together. Kudos to them for sticking to design (within the mm!).
Our digital workflow and highly-skilled team were able to deliver and install on-time, with zero alterations.
Monthly Archives: January 2024
Tonneau with bars
Some photos of a custon tonneau showing custom-made stainless steel cross-bars and felt lining.