Manufactured and installed at one of our favourite clients in less than 3 weeks from go-to-whoa. Go enjoy a tasting under them at The Hunting Lodge, Waimauku.
3 large overlapping shade sails covering an outside area that follows a turn in the building. All made from Ferrari 502 – the Gold-Standard in structural and architectural PVC.